Define the lifting duty.
Working load, horizontal reach, lifting height, duty cycle, installation space, chassis limits and operating environment form the first technical envelope.


A detailed case-study framework for showing how a technical brief becomes integrated equipment.
How JECO can structure a truck-mounted crane integration around duty, chassis, hydraulics, controls, fabrication and validation—without separating the machine from its operating context.

Working load, horizontal reach, lifting height, duty cycle, installation space, chassis limits and operating environment form the first technical envelope.
Mounting structure, stability, hydraulic power, controls, boom geometry and operator access have to be resolved together.
Fabrication, hose routing, component placement, reinforcement and service access turn drawings into working hardware.
Functional checks, operating sequence and project-specific acceptance criteria close the build before lifecycle support begins.
Send the technical brief and JECO can structure the project conversation around measurable operating needs.